Small hydro (water) power systems

時(shí)間:2008-05-27

來(lái)源:中國(guó)傳動(dòng)網(wǎng)

導(dǎo)語(yǔ):Small hydro (water) power systems

[font=Arial] If you have a suitable water source, installing a hydro-power system will allow you to create green, clean energy. Hydro-power systems convert the potential energy stored in water to rotate a turbine which in turn produces electricity. How does it work? Power may be produced from even a small stream, and a micro (small) hydro plant is classified as one that generates less than 100 kilowatts (kW). Systems range from a few hundred watts (possibly for use with batteries) for domestic schemes, to over 25kW for commercial schemes. The Energy Saving Trust says that improvements in small turbine and generator technology mean that small hydro schemes are an attractive means of producing electricity. Hydro systems can be connected to the national electricity grid or be part of a stand-alone (off-grid) power system. In a grid-connected system, any electricity generated, but not used, can be sold to electricity companies. In an off-grid hydro system, electricity can be supplied directly to the devices powered or through a battery. A back-up power system may be needed to compensate for variations in water flow throughout the year. What are the practicalities? Hydro power requires the water source to be relatively close to where you will use the electricity generated, or to a suitable grid connection. The amount of energy generated depends on how fast the water flows and how far the water falls – so you need a fast flow and a good drop. In small systems around half of the power of the water is actually converted to electrical power. You will need to talk to the relevant planning authorities to ensure the site and design are acceptable and identify any other permissions required. How much does it cost? Hydro costs depend very much on the site and energy output. For small systems using an existing pond or weir, costs may be in the region of £4,000 per kW installed up to about 10kW - and would drop per kW for larger schemes. For medium sized systems, there is a fixed cost of about £10,000 and then about £2,500 per kW up to around 10kW - so a typical 5kW domestic scheme might cost £20,000 to £25,000, according to the Energy Saving Trust.[/font]
中傳動(dòng)網(wǎng)版權(quán)與免責(zé)聲明:

凡本網(wǎng)注明[來(lái)源:中國(guó)傳動(dòng)網(wǎng)]的所有文字、圖片、音視和視頻文件,版權(quán)均為中國(guó)傳動(dòng)網(wǎng)(www.treenowplaneincome.com)獨(dú)家所有。如需轉(zhuǎn)載請(qǐng)與0755-82949061聯(lián)系。任何媒體、網(wǎng)站或個(gè)人轉(zhuǎn)載使用時(shí)須注明來(lái)源“中國(guó)傳動(dòng)網(wǎng)”,違反者本網(wǎng)將追究其法律責(zé)任。

本網(wǎng)轉(zhuǎn)載并注明其他來(lái)源的稿件,均來(lái)自互聯(lián)網(wǎng)或業(yè)內(nèi)投稿人士,版權(quán)屬于原版權(quán)人。轉(zhuǎn)載請(qǐng)保留稿件來(lái)源及作者,禁止擅自篡改,違者自負(fù)版權(quán)法律責(zé)任。

如涉及作品內(nèi)容、版權(quán)等問(wèn)題,請(qǐng)?jiān)谧髌钒l(fā)表之日起一周內(nèi)與本網(wǎng)聯(lián)系,否則視為放棄相關(guān)權(quán)利。

關(guān)注伺服與運(yùn)動(dòng)控制公眾號(hào)獲取更多資訊

關(guān)注直驅(qū)與傳動(dòng)公眾號(hào)獲取更多資訊

關(guān)注中國(guó)傳動(dòng)網(wǎng)公眾號(hào)獲取更多資訊

最新新聞
查看更多資訊

熱搜詞
  • 運(yùn)動(dòng)控制
  • 伺服系統(tǒng)
  • 機(jī)器視覺(jué)
  • 機(jī)械傳動(dòng)
  • 編碼器
  • 直驅(qū)系統(tǒng)
  • 工業(yè)電源
  • 電力電子
  • 工業(yè)互聯(lián)
  • 高壓變頻器
  • 中低壓變頻器
  • 傳感器
  • 人機(jī)界面
  • PLC
  • 電氣聯(lián)接
  • 工業(yè)機(jī)器人
  • 低壓電器
  • 機(jī)柜
回頂部
點(diǎn)贊 0
取消 0